Excavator Rental Bali — SANY SY75C 7 Ton
7-ton excavator for large projects: deep excavation, cut & fill, bore pile, material loading. Operator and fuel are included in the price.
Operator + fuel included · 7 ton · bucket / breaker / bore pile
WhatsApp — Check AvailabilitySANY SY75C – Excavator 7 Ton
JKR's flagship unit for medium to large-scale construction projects in Bali.
| Operating Capacity | ±7,3 Ton (7.280 kg) |
| Width | 2,22 meter |
| Total Length | 6,12 meter |
| Height (cabin) | 2,72 meter |
| Bucket Capacity | 0,28 m³ |
| Max. Digging Depth | 4,02 meter |
| Max. Reach | 6,24 meter |
| Engine | Isuzu 4LE2 · 43 kW |
| Fuel | Included |
| Operator | Included in package |
| Attachment | Bucket / Breaker / Auger |
Unit Dimensions — Measured & Accurate
Length 6,12 m · Height 2,72 m · Max dig 4,02 m · Reach 6,24 m
SANY SY75C Rental Price
Bucket Standard
With Breaker
Contact the JKR team to confirm unit availability, pricing, and schedule. Before the unit is delivered, prepare the project PIC's KTP for rental administration.
Suitable for Work
Excavation & Cut Fill
Soil excavation, basement work, land terracing, and cutting for construction projects.
Loading Material
Load soil, rocks, and construction materials onto dump trucks with high efficiency.
Bore Pile
Foundation drilling with 30–40 cm diameter auger for building pile foundations.
Demolition
Demolish concrete, walls, and old structures using breaker attachment.
Drainage
Excavation of drainage channels, culverts, and project water management systems.
Landscaping
Land preparation, soil leveling, and large-scale landscaping work.
Related Services
Mini Excavator Kubota U30
3-ton excavator for narrow spaces and villa projects.
Dump Truck 5 m³
Transport of excavated material to the destination location.
FAQ – SANY SY75C
The rental price for SANY SY75C is Rp 395rb/hour (bucket) and Rp 495rb/hour (breaker). Includes experienced operator and fuel. Minimum 8 hours of work on the first day (all attachments). Subsequent days minimum 4 hours of work if the operator is already on site.
The hourly rate does not include mobilization. Mobilization fee starts from Rp 1,500,000, depending on the distance from our base in Canggu, Badung.
SANY SY75C is best suited for large-scale soil excavation, cut & fill, material loading, bore pile, and demolition with breaker. For narrow areas or small alleys, we recommend using Kubota U30.
Before the unit is delivered, please prepare the project PIC's KTP for rental administration. Once the project details are confirmed, the JKR team will coordinate and schedule the unit.
How to Rent an Excavator from JKR
Easy, transparent, and professional process — 6 simple steps
Equipment Need Consultation
Contact JKR via WhatsApp. Share the equipment type, type of work, and desired schedule.
Send Location & Work Details
Share the project location, road access, soil type, and estimated work duration with the JKR team.
Confirm Unit, Price & Schedule
The JKR team provides a transparent offer. Unit, price, and schedule are confirmed together.
Prepare the Person in Charge's KTP
Before the unit is delivered, prepare the project PIC's KTP for rental administration.
JKR Team Verification & Coordination
The JKR team verifies data and coordinates the operator, unit, and mobilization route.
Unit Delivered to Project Site
The unit is scheduled and delivered to the project site. The operator is ready to work according to your instructions.
Need a SANY SY75C Excavator?
Contact us now for consultation and the best offer.
Monday – Saturday, 07.00 – 18.00 WITA