Bore Pile Service Bali: Price Per Meter, Diameter Options & Work Process

Bore Pile Service Bali with SANY SY75C Excavator

The foundation is the most critical element in a building. In Bali, the varied soil conditions — from soft clay soil in Denpasar to rocky soil in the Bukit area — often require a pile foundation system such as bore pile to ensure long-term stability.

This article explains in full about bore pile service in Bali: what is bore pile, when it is needed, how much it costs, diameter size options, and how the work process is carried out by JKR.

What is Bore Pile?

Bore pile is a pile foundation system made by drilling the ground to a certain depth, then filling the borehole with reinforcing steel and cast concrete. This method produces cylindrical foundation piles with high vertical load-bearing capacity.

Unlike driven piles that are hammered into the ground, bore pile is done by drilling so that it does not cause excessive vibration and is safer for densely built-up areas.

Bore Pile Prices Bali 2026

DiameterPrice Per MeterEquipment Used
30 cmRp 95.000/meterExcavator + Auger 30 cm
40 cmContact JKRExcavator + Auger 40 cm

Important notes:

  • Price includes drilling service and operator fee
  • Reinforcing steel and cast concrete not included (provided separately by project owner)
  • Mobilization fee calculated separately, starting from Rp 1.500.000
  • Price may vary depending on soil conditions and depth

Need an excavator for your project?

Free consultation · Fast response · Transparent pricing

Chat WhatsApp

When Does a Project in Bali Need Bore Pile?

Not all projects require bore pile. Here are the conditions that typically require this pile foundation system:

  • Soft soil or peat: Shallow soil bearing capacity is insufficient for building loads
  • Multi-story buildings (2 floors and above): High vertical loads require deep foundations
  • Contoured or sloping land: Terraced Rice Fields in Ubud, Tabanan, South Badung
  • Location near the coast or river: Soil conditions are unstable and prone to shifting
  • Former rice field or pond area: Unconsolidated fill soil
  • Reconstruction of old buildings: Additional load on existing foundations

Bore Pile Process by JKR

  1. Survey & Point Marking: The JKR team together with the project supervisor determines the bore pile points based on structural drawings.
  2. Unit Mobilization: SANY SY75C excavator with auger attachment is delivered to the site using a lowbed trailer.
  3. Soil Drilling: The auger rotates into the ground according to the specified diameter and depth.
  4. Hole Cleaning: Excavated material is lifted out, the hole is cleaned of mud and loose material.
  5. Reinforcement Bar Installation: Performed by the project owner's structural team (not included in JKR's service).
  6. Concreting: The hole is poured by the project owner's team. Process complete.

Advantages of Bore Pile Compared to Other Foundation Systems

  • Does not produce vibrations that damage surrounding buildings
  • Suitable for dense areas adjacent to existing buildings
  • Can adjust depth according to local soil conditions
  • Concrete and reinforcing steel materials are visible and quality-controllable
  • Higher load-bearing capacity compared to strip foundations for soft soil

JKR Bore Pile Service Area

JKR serves bore pile services throughout Bali, with priority areas:

  • Badung — Canggu, Seminyak, Kuta, Uluwatu, Nusa Dua
  • Denpasar — all of Denpasar city
  • Gianyar — Ubud, Sukawati, Mas
  • Tabanan — Tabanan, Mengwi
  • All 9 regencies/cities in Bali with mobilization costs adjusted by distance